Sap Netweaver System Requirements

We use cookies and similar technologies to give you a better experience, improve performance, analyze traffic, and to personalize content. By continuing to browse this website you agree to the use of cookies. All products based on SAP NetWeaver AS ABAP 7.4 are supported. Requirements: Additive sizing – Additional memory resources for the SAP NetWeaver AS ABAP system needs to be available on the SAP HANA server. Feature list for SAP MaxDB/liveCache 7.9: 1914052: NetWeaver 7.40 Database Dependencies: 1600929: SAP BW powered by SAP HANA DB: Information: 62988: Service Packs for Microsoft SQL Server: 2052760: MSS: Additional Information – Software Update Manager 1.0 SP12: 2040114: SAP HANA: Additional information - Software Update Manager 1.0 SP12: 2039640.

Platform

• VirtualBox
• Windows Server 2008 R2
• Microsoft SQL Server 2012
• SAP NetWeaver 7.4

Prerequisites

VirtualBox installer
Windows Server 2008 R2 ISO – Download the 180 EVALUATION days from Microsoft website.
• Microsoft SQL Server 2012 (51046000)*
• SAP NetWeaver 7.4
– SWPM*
– Installation export (51045855)*
– Kernel (51046232_2)*
– SL Controller (51046232_3)* Accumark pattern design software free.

Note

Sap

* search the media files from SAP Service Marketplace.

Preparations

Install the VirtualBox and configure Virtual Machine.
Install Windows Server 2008 R2.
Install Microsoft SQL Server 2012.

Installation

1. Launch the sapinst from the Software Provisioning Manager. Before start the installation, it is recommended to run SAP Prerequisite Check to ensure all the requirements are met.

2. Once you complete and verified the prerequisite checks, you can continue to navigate as below, SAP NetWeaver 7.4 > MS SQL Server > SAP Systems. In this example, we are going to install the Standard System of Application Server ABAP.

3. Select Custom Parameter Settings.

4. Choose OK to log off. You need to log in back to continue the installation.

Sap netweaver system requirements documentation

5. Set the SID.

6. Set the FQDN & enter the DNS (you can skip).

7. Locate the required kernel (UNICODE Kernel 740)

8. Enter the Master Password.

9. Define the domain model installation (we use Local Domain for this installation).

10. Maintain the operating system user password.

11. Enter the database instance name.

12. Click Next.

13. Define the Windows Domain for Host Agent.

14. Enter the operating system password for SAPADM.

15. Locate the installation export. Hive jump review.

16. Define the SAP database schema password.

17. Define the expected system size.

18. You can adjust the database configuration files sizes and location. Once done, click Next.

19. Accept the default configuration of tempdb. Click Next.

20. Enter the number of parallel jobs. SAP recommended to use maximum 2-3 R3loads per CPU.

21. Set the instance number for the Primary Application Server Instance and ABAP Central Services Instance.

22. Use the default and click on Next.

23. Set the ‘webadm’ password for ICM User Management.

24. Locate the SL Controller media file.

25. Accept the default and click Next.

26. Define the diagnostic agent SID and installation drive.

27. Set the diagnostic agent Windows domain (we use Local Domain).

28. Set the OS users password for the diagnostic agent.

Sap Netweaver System Requirements

29. Click Yes.

30. Define the diagnostic agent instance number.

31. Choose the SLD destination. (we choose to No SLD destination – since we haven’t configured the SLD)

32. Unpack the archives again (for diagnostic agent). Accept the default and click Next.

33. At last, the parameter summary screen! You can verify all the settings before start the installation. Click on Revise to adjust else, click on Next to start the installation.

34. The SAP Netweaver 7.4 installation is now begin. You may monitor the progress time by time – you may see the progress at the screen bottom.

35. SAP Netweaver 7.4 installation complete!

36. You can now login to the newly installed SAP Netweaver 7.4. You may need to reset the SAP* password on client 000 first before be able to log in.

Introduction:

I, Pradeep Srigiri working as Architect and has around 15 years of experience in SAP. Currently, I work for YASH Technologies. This blog post consists of High-Level technical information on S/4HANA Conversion Road Map from SAP Basis perspective from On-Premise to Cloud or Vice-Versa or Cloud to Cloud. However, I would like to recommend following the SAP Standard Guides & SAP Notes during the S/4HANA Conversion Process. This blog post will take you there in a structured method for current release and can use same process for other releases to find out the details easily.

SAP S/4HANA Conversion Road Map:

The blog post consists of the below steps.

Discovery Phase
System Requirements & Planning:
Sap Netweaver System Requirements
  • Supported OS Versions for S/4HANA 1909
    SUSE Linux 12.0 or greater
    RHEL 7.0 or greater
    AIX 7.1 & 7.2
    Microsoft Windows 2016 or 2019
  • Supported DB Version – S/4HANA 1909
    HANA 2.0 SP04 (Min)
  • Minimum Source Versions with UNICODE required for S/4HANA 1909
    SAP ERP 6.0 SP20
    EHP2 FOR SAP ERP 6.0 SP10
    EHP3 FOR SAP ERP 6.0 SP09
    EHP4 to EHP8 FOR SAP ERP 6.0 No minimum SP required.
  • Compatible NetWeaver versions for S/4HANA 1909
    SAP NetWeaver 7.0 SP14
    SAP EHP1 for SAP NetWeaver 7.0 SP05
    SAP EHP2 for SAP NetWeaver 7.0 SP06
    SAP EHP3 for SAP NetWeaver 7.0 SP01
    SAP NetWeaver 7.4 SP02
  • For Cloud Support OS, DB & SAP, Check the below SAP Notes
    1656099 – SAP Applications on AWS: Supported DB/OS and AWS EC2 products
    1928533 – SAP Applications on Azure: Supported Products and Azure VM types
    SAP Note 2456406 – SAP on Google Cloud: Support Prerequisites
  • Compatibility Matrix Checks – use PAM in SAP Support Portal
  • Tools Used – DMO of SUM 2.0 SP8 (Latest) if Source is on non-HANA DB
    DMO with System Move for Conversion with DB Migration & data center relocation
  • Use Data Volume Reduction – SAP Data Volume Management
    Reduces the data footprint & achieve a shorter conversion duration
    Capabilities supporting the pre- and post-conversion phases
    One central tool is the SAP DVM Work Center (DVM WoC) in SAP Solution Manager
  • Maintenance Planner
    Generates the download files for Conversion
  • List of supported add-ons see SAP Note 2214409.
  • Business functions can have the following status: always_on, customer_switchable, and always_off (SAP Notes 2240359 and 2240360)
  • Checks Industry Solutions – SAP Note 2799003
  • SAP Solution Manager & SAP Systems – Backend SAP Support Connection
  • To download & implement the SAP Notes
  • To Pull the Latest Simplification Items from Support Portal to run the reports
Documentation

Conversion Pre-Check:

Readiness Check

  • Achieve Next Generation SAP Business Scenario Recommendations
  • Implement SAP Note 2745851
  • Implement SAP Note 2758146
  • Follow the steps mentioned in https://d.dam.sap.com/a/AREDtXr/Next-Generation_BSR_How_To-V27.pdf and upload the zip file in the SAP’s website.
  • Setting up SAP Readiness Check 2.0
  • Implement SAP Note 2758146
  • RC_COLLECT_ANALYSIS_DATA is the Report
  • Activity 16 (Execution) of Authorization Object S_DEVELOP is required
    • For Discovery Phase Selection
    • Implement SAP Note 2185390: Set up custom code analysis
    • Implement SAP Note 1872170: Enabling SAP S/4HANA sizing
    • Implement SAP Note 2399707 – Simplification Item Check
    • Implement SAP Note 2769657 – INR: Interface Discovery for Idoc
    • Implement SAP Note 2721530 – Enabling Data Volume Management analysis
    • Implement SAP Note 2811183 – Enabling BP/CVI Analysis with Readiness Check 2.0
    • Implement SAP Note 2781766 – Enabling ATC check result export for SAP Readiness Check 2.0
    • Implement SAP Note 2502552 – S4TC – SAP S/4HANA Conversion & Upgrade new Simplification Item Checks
  • I Executed the Report RC_COLLECT_ANALYSIS_DATA in SE38 choosing relevant pre-check options (Background)
  • Launch the SAP Readiness Check application using https://rc.cfapps.eu10.hana.ondemand.com and use the ZIP file that was generated from the program RC_COLLECT_ANALYSIS_DATA.
  • To create a new analysis, I have clicked Create New Analysis
  • SAP Readiness Check 2.0 will be ready under 30 minutes and followed with Pre-Checks Analysis
  • For Custom Code Adjustments – Run program SYCM_DOWNLOAD_REPOSITORY_INFO
  • Download the ZIP file and upload it to the Readiness check Link by selecting “Update Analysis”

Hisd Sap Netweaver

Addon Compatibility Check

  • Retrieves the add-on and business function data from Maintenance Planner
  • Check SAP Note 2214409
  • Business functions
  • Simplification Item Check to identify the mandatory steps before converting your system.
  • CVI Conversion Prep

Custom Code Migration & Simplification Item Checks:

  • Need to be performed by the respective teams using the latest custom code apps provided by SAP and implement the SAP Notes related to the Simplification Item Checks in the system before the Basis Team runs the SUM tool to start the Technical Conversion

Conversion Planning – landscape

Parallel Landscape Build

  • Implement emergency fixes and to reduce the timelines for the code-freeze – build a parallel conversion/migration landscape.
  • Any emergency change that is implemented in production landscape should also be applied in conversion/migration landscape.

It’s always recommended to have Sandbox ready with a copy of Production System in order to start the S/4HANA Conversion to have a better under standing on the impact and procedure that can be followed in the upcoming systems with lessons learn during the Sandbox System conversion. However, the above Parallel Landscape is being used only for Development, Quality & Production Systems

High Level Roadmap

  • Below pictorial diagram shows the process flow to achieve S/4HANA Conversion & Migration to Cloud or to On-Premise

Sap Netweaver 7.5 Minimum System Requirements

High Level Cost Estimate

H/W Estimates:

  • To determine the H/W sizing, implement SAP Note 1872170: Enabling SAP S/4HANA sizing
  • Execute the program /SDF/HDB_SIZING in SE38
  • or select the pre-check option in SAP Readiness Check Report RC_COLLECT_ANALYSIS_DATA

Sap Netweaver Portal Flynnrg

Result: Upload the ZIP file in Readiness Check Link

  • Below is the Sizing information
  • Sizing for SAP Applications can be determined based on the current landscape for DEV, QAS & PRD systems with some additional increase in the Hardware Resources

S/W Estimates:

  • Based on the system requirements column, any one of the mentioned releases & version can be on the source system to perform the conversion to S/4HANA
  • S/4HANA 1909: Impact on current landscape – Use Upgrade Dependency Analyzer from Support Portal : https://apps.support.sap.com/sap(bD1lbiZjPTAwMQ)/support/uda/main.htm and System Requirements for NetWeaver
  • Procurement of S/4HANA License from SAP
  • Identify the Solution Approach based on the existing releases
  • Based on the Solution Approach, estimate the man days required for Basis to perform

Pre-Conversion Action list

Basis:

Sap Netweaver Minimum System Requirements

  • Implement SAP Notes related to pre-checks using SNOTE
  • Remove Client 066 – Not used in S/4HANA: Check SAP Note 1749142
  • Uninstall Fiori Apps – if not released for SAP_UI 7.50: Check SAP Note 2034588
  • Use Maintenance Planner to calculate stack.xml file and download files required for S/4HANA conversion
  • Perform OS Prerequisites on S/4HANA Application & Target HANA Server
  • Download the HANA Installation Media
  • Setup Target HANA Server based on the Installation Guide
  • Perform the prerequisites for HANA DMO – if required. For Prerequisites check SAP Notes 2882441 & 2832250
  • Download SUM 2.0 SP8 on Source and Target Application Servers with the downloaded files

Target Landscape

  • Based on the source SAP, DB & OS versions – below are the Major migration options

Note: Target or Source can be On-Premise or Cloud

  1. One Step Migration: HANA DMO with S/4 HANA Conversion during the same maintenance window

2. Two Step Migration: Existing SAP/DB Upgrade and HANA DMO with S/4HANA Conversion

or

Sap Netweaver 7.5 System Requirements

Lift & Shift AS-IS to Cloud and HANA DMO with S/4HANA Conversion

  • HANA DMO required if source is on Non-HANA DB

Conclusion:

I would like to conclude that I have validated the SAP SUM DMO Guides and S/4HANA Conversion Guides from Support Portal and relevant information from the Notes mentioned in this blog post. I have followed the above mentioned steps & process and was able to achieve the goal which is S/4HANA 1909 conversion. Tamilukkum amudhendru per song free download.

Reference below:

https://help.sap.com/doc/2b87656c4eee4284a5eb8976c0fe88fc/1909/en-US/CONV_OP1909_latest.pdf

Thank you! Hope the blog post is helpful.

Best Regards,

Sap Netweaver System Requirements Administrator

Pradeep Srigiri, Architect